The ideas also include things like an enormous battery at the location, to ensure surplus ability may be saved to the night, and also a 220 kV transmission line which will join the challenge on the North Star sub-station, near exactly where a fresh a hundred MW solar task is https://totalsolar.com.au/wp-content/uploads/2024/10/SeraphimSIVN-TOPcon_SRP-425.440-BTD-BG-AU.pdf